Planning
Scope smarter. Execute cleaner. Avoid the "we didn't plan for that" moment.

What problem does Planning solve?
Planning eliminates scope coordination breakdowns by centralizing pre-job planning so contractors, supervisors, and procurement align before work starts. It prevents miscommunication, duplicated work orders, and rework from unclear scope.
In most environments, a field change doesn't automatically trigger updates to labor assignments, cost projections, or schedule dependencies—and that disconnect causes cascading delays.Understand why contractor-heavy operations struggle with scope coordination →
Scopes Change Daily
Updates aren't reflected in schedules, causing misalignment.
Communication Lags
Delays between teams lead to mismatched priorities and efforts.
Late Discovery
Budget and timeline impact often discovered after decisions are made.
Manual Rework
Frequent updates to align labor, vendors, and materials slow everyone down.
No Automatic Updates = Project Chaos
Key Benefits
Build estimates from a shared, catalog-based rate structure
Align vendors, planners, and project owners before the first shift
Reduce change orders driven by poor scope definition
Track labor assumptions across trades and phases
Connect scopes directly to sourcing and labor tracking
Eliminate inflated, copy-pasted estimate spreadsheets
Unit Rate Billing Support
Planning builds estimates from catalog-based unit rate structures that enforce pricing discipline and enable global standardization across multi-site operations.
Learn More About Unit Rate"One change used to take three emails and a spreadsheet."
At one major site, a shutdown planner used Planning to map estimate changes directly into their contractor planning sheet.
With catalog pricing and real-time coordination, AES/32 reduced rework cycles by over 50% during the pre-event window.
Reduction in rework cycles
Works Best With...
Planning integrates seamlessly with these AES/32 modules to create end-to-end contractor oversight.Learn how AES/32 complements your ERP and VMS →
Who uses Planning day-to-day?
TAR coordinators, maintenance planners, procurement managers, and site supervisors use Planning to build scope packages, align contractor assignments, and track scope-to-execution handoffs.See all personas who benefit from AES/32 →
What makes Planning different from Excel or SharePoint?
Unlike static spreadsheets, Planning provides version control, role-based access, and direct links between scope items and field execution data. Teams see live status updates instead of stale documents.
Without Planning
- Static spreadsheets with no version control
- Scope changes trigger manual updates across teams
- No connection between planning and field execution
- Teams work from outdated scope documents
- Coordination breakdowns and rework
With Planning
- Automatic version control and change tracking
- Real-time scope updates visible to all teams
- Direct links to labor, costs, and field execution
- Role-based access and approval workflows
- Everyone works from the same live scope data
Works with Scheduling and Cost Estimating Tools
Planning is designed to complement—not compete with—your planning tools. It connects scoped work to field realities and integrates with your scheduling or estimating environment to keep scope aligned with labor plans, rates, and vendor data.